Multifunctional hall Gossau

On 26 October 2020, the 36-metre long and 34-tonne main beam of the multifunctional hall in Gossau ZH was assembled. The connections were all made using our in-house GSA-Technology. Great to see how everything fits! You can find the video here.
Source: www.bunts.ch